London Underground Tube Lines P400 Power Supply Upgrade
L.C. SWITCHGEAR LTD.
+44 (0)1273 770540

London Underground Tube Lines P400 Power Supply Upgrade

19.02.2015

Case Study Image

LCS is just starting to supply manual off load / fault make Depot Switches and motorised and manual Tunnel Switches for the Jubilee, Northern and Piccadilly Lines. The products are based on the experience of the Tunnel Switches supplied for the Victoria Line Upgrade, Metropolitan Line Upgrade and the Jubilee Line Upgrade in the mid 90’s. The first deliveries will be for High Barnet and Edgeware followed by Cockfosters.

< Back to Case Studies & events