Work on Ealing Common is already underway and is first for completion in 2015, with the Upminster depot revamp expected to be completed by 2016.

LCS is providing the complete shore supply system from the Isolating and Changeover Supply Isolators, through the Road Contactor Suites, to Overhead Switchable Trolleys & Pedestals to the train. DDM Mimic Panels & Overhead Status Indicators provide feed-back to the DDM, operators and maintainers.

EPO Emergency Power Off Panels marshal the emergency pushbuttons within the depot via ‘Safety Relays’ and safely remove power from depot roads in an emergency.

This employs the LU approved products previously supplied to Stonebridge Park, Hainault, Northumberland Park, Ruislip, London Road, Waterloo & City, Neasden & Hammersmith.

 

 

 