Southern Depot Improvement
L.C. SWITCHGEAR LTD.
+44 (0)1273 770540

Southern Depot Improvement

03.03.2003

Case Study Image

Southern Depot Improvement

LCS provided the shore supply system from the Controlled Track Switches (Mk3) (CTS) and the LCS2 Supply Disconnectors, through to the Road contactor Suites, to Trolleys & Pedestals (Supplied by others) to the train. This project provided maintenance and stabling facilities for the Southern fleet of Electrostar rolling stock at Brighton, Selhurst, Streatham, Littlehampton and Bognor.

 