Gap Jumper Leads start trial on London Underground
L.C. SWITCHGEAR LTD.
+44 (0)1273 770540

Gap Jumper Leads start trial on London Underground

01.02.2015

News Image

Newly developed Gap Jumper Leads which are used by London Undergroung to apply power safely to trains that are 'gapped' i.e. between sections of conductor rail and unable to move. They are under trial with London Underground with a view to providing cover accross the network where notorious gapping areas exist.

To assist with correct positioning the Gap Jumper Leads are colour coded Red for positive and Blue for negative.

Features

The LCS Gap Jumper Lead design incorporates the following features:

A shoe assembly that houses the conduction plate with integral magnets to suit various conductor rails, the cable connection point, cable restraint gland and conductor rail location guides.

The conduction plate is made from plated Brass which is plated to provide good corrosion resistance.

Connection force and stability assisted by the use of magnets. (Previously only the weight of the shoe with support of the cables by the operator)

Magnets are located within the conduction plate to enable the magnetic field to interact with the conductor rail/s

An insulated lifting handle is positioned towards the top of the connection shoe to allow easy positioning on the conductor rails.

The supply cable enters the shoe assembly horizontally (previously the cable entered via the top of the shoe assembly, hence the need for support by the operator)

The design allows the re-use of existing cables.

The lift handle allows the removal of the shoe by tilting the assembly to disconnect the magnetic forces. Lift of force 16kgf.

The rail guides also serve to provide a barrier by distance to the magnetic field.

The Gap Jumper shoe fits all 4 of the Conductor Rail profiles used by London Underground including the composite Stainless Steel / Aluminium rail.

 

 

 

< Back to news & events